Chevron Phillips Delivery

We recently delivered two transformers to the Chevron Phillips Chemical (CPChem) Sweeny Complex in Texas. Built at our Pocatello facility and designed with a 60-year lifespan, these 60/100 MVA, 138/34.5 kV power distribution units will help provide decades of reliable power to the facility’s operations.

The Chevron Phillips Chemical Sweeny Complex has been in operation since 1944. Located 50 miles southwest of Houston, the facility is adjacent to the Phillips 66 Refinery. The Sweeny Complex is one of the world’s largest single-site ethylene facilities, capable of producing over 11 million pounds of ethylene per day.

Virginia Transformer is proud to support commercial and industrial projects across the country by delivering the highest-quality transformers with the shortest lead times in the industry.

Congratulations to our manufacturers’ representative from Double E Engineering, Margaret Coco, who led this sale, and all those involved who helped to design, manufacture, and deliver this unit.